Our new single building complex is located in a most desirable area called Avsallar. Approximately 10 minutes walk from Avsallar's picturistic beach. The project was designed with high standards to bring its residents the best quality of life. Nearby you can find all essential amenities such as supermarkets, hospitals, pharmacies, shops, and restaurants within 400 meters.
Located close to the city center, it also offers a great view of the mountains and green habitat. Also, this project's greatest selling point is most likely to be the lifelong guaranty sea view.
The complex will consist of one 5-story residential block, 18 apartments with different layouts that range from 100 m² to 175 m². The properties are designed in a modern and spacious way to bring maximum comfort. Each floor will only consist of 4 apartments except the fourth floor that will have six duplex apartments.
All apartments are fitted with high-quality materials around the floors, walls, and rooms such as the kitchen and bathroom. Pi Residence is an excellent investment in high standard living, located in an area of 1600 m². The social areas will be decorated with lots of plants, beautiful green grass, and a gorgeous fountain.
Types of apartments for sale
- 2-bedroom apartments with 100m²
- 4-bedroom duplex apartments with 145m²
Two of the 18 apartments for sale will have an American style kitchen.
Distance from Amenities
- Distance to the center of Avsallar: 400 m
- Distance to the sea: 700 m
- Distance to Gazipasa Airport: 67 km
- Distance to Antalya airport: 102 km
- Walking distance to Avsallar Bazaar on Wednesdays
Technical Specifications
- Granite countertops in the kitchens
- Wooden cabinets and drawers in both the kitchen and bathrooms
- PVC windows that offer sound and heat insulation
- Sound insulation in all walls
- Reinforced steel entrance doors
- High-quality wooden doors in rooms
- Aluminum railings and glass on the balconies
With only a %30 Downpayment, installments are available for up to 12months.
Date of Begining: January 2021
Date of Completion: December 2022